The peaceful demonstration was coordinated by the local Association of Responsible Jurassic Citizens (CRJ), which is calling for an immediate end to the project.
Some locals are angry about the Jura government’s U-turn last year to relaunch a deep geothermal project at Haute-Sorne, west of the town of Delémont, which would involve injecting water 5,000 metres underground.
The protesters are worried about risks to underground water sources, seismic activity and possible radioactivity. They have doubts about the long-term sustainability of the project, which is backed by the federal authorities, and are calling on Jura parliamentarians to get involved.
A popular initiative launched by opponents of the project was annulled by the Constitutional Court in 2018, and a subsequent appeal by Haute-Sorne residents was rejected the same year by Switzerland’s highest court.
In February the promoters of the project tested seismic activity in the region. An exploratory phase is due to begin next year. Geothermal energy production is planned to start in 2028-2029, according to a provisional timetable of the Zurich company Geo-Energie Suisse (GES). The local branch, Geo-Energie Jura, hopes to use deep geothermal sources to meet the electricity needs of 6,000 local homes.
Just over a year ago, the Federal Office of Energy welcomed the Jura government’s decision to relaunch the project. The federal agency, which has allocated CHF90 million towards the initiative, said it “opened the way to complete an important electricity production pilot project.”
Switzerland is exploring several alternative energy options to help achieve its goal of being CO2 neutral by 2050. The association Geothermie Schweiz [Geothermal Switzerland] believesExternal link that at least a quarter of the country’s heating needs could be met by hot underground sources – mainly low and medium-depth installations – by 2050.
The Federal Office of Energy is also confident: according to its 2050 scenario, 7% of national electricity consumption could be covered by geothermal sources.External link
But the renewable energy source has met with some difficulties. Some sites have been shut down or temporarily stopped after being blamed for creating earth tremors.
More recently, a much anticipated showcase geothermal project in Lavey-les-Bains in western Switzerland was suspended for technical reasons.
Popular Stories
More
Foreign Affairs
How a top Swiss university is screening Chinese students
Two decades after tsunami, Swiss tourists flock to Southeast Asia
This content was published on
Twenty years after a catastrophic tsunami in Southeast Asia, the region is again a top destination for Swiss, including at Christmas.
Swiss forests better equipped for storms 25 years after Lothar
This content was published on
Twenty-five years after Hurricane Lothar wreaked havoc in Switzerland, the country’s forests are now better prepared, experts say.
Media: Swiss medical services done abroad are billed at Swiss rates
This content was published on
In Switzerland, some medical services carried out abroad are still billed at Swiss rates, despite costing less, RTS reports.
This content was published on
Sophie Hediger, a member of the Swiss national snowboard cross team, has died in an avalanche in Arosa. She was 26 years old.
This content was published on
Several Swiss films exceeded the 100,000 admissions mark worldwide in 2024 and received widespread praise at international film festivals.
Swiss Alpine resorts covered in white gold for Christmas
This content was published on
Many areas at low altitudes in Switzerland are enjoying a blanket of snow. In the mountains, intense precipitation has delighted skiers.
SWISS makes emergency landing in Austria after smoke in cockpit
This content was published on
Swiss International Airlines (SWISS) made an emergency landing of an Airbus in Graz, Austria on Monday evening after engine problems.
If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.
Read more
More
Work begins on Swiss geothermal project after 20-year wait
This content was published on
Drilling has commenced at a Swiss geothermal project, designed to heat up to 3,000 homes, following a 20-year planning process.
This content was published on
Tests to determine the viability of geothermal energy projects in Switzerland have been hit by delays in getting the necessary planning permits.
You can find an overview of ongoing debates with our journalists here . Please join us!
If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.