The peaceful demonstration was coordinated by the local Association of Responsible Jurassic Citizens (CRJ), which is calling for an immediate end to the project.
Some locals are angry about the Jura government’s U-turn last year to relaunch a deep geothermal project at Haute-Sorne, west of the town of Delémont, which would involve injecting water 5,000 metres underground.
The protesters are worried about risks to underground water sources, seismic activity and possible radioactivity. They have doubts about the long-term sustainability of the project, which is backed by the federal authorities, and are calling on Jura parliamentarians to get involved.
A popular initiative launched by opponents of the project was annulled by the Constitutional Court in 2018, and a subsequent appeal by Haute-Sorne residents was rejected the same year by Switzerland’s highest court.
In February the promoters of the project tested seismic activity in the region. An exploratory phase is due to begin next year. Geothermal energy production is planned to start in 2028-2029, according to a provisional timetable of the Zurich company Geo-Energie Suisse (GES). The local branch, Geo-Energie Jura, hopes to use deep geothermal sources to meet the electricity needs of 6,000 local homes.
Just over a year ago, the Federal Office of Energy welcomed the Jura government’s decision to relaunch the project. The federal agency, which has allocated CHF90 million towards the initiative, said it “opened the way to complete an important electricity production pilot project.”
Switzerland is exploring several alternative energy options to help achieve its goal of being CO2 neutral by 2050. The association Geothermie Schweiz [Geothermal Switzerland] believesExternal link that at least a quarter of the country’s heating needs could be met by hot underground sources – mainly low and medium-depth installations – by 2050.
The Federal Office of Energy is also confident: according to its 2050 scenario, 7% of national electricity consumption could be covered by geothermal sources.External link
But the renewable energy source has met with some difficulties. Some sites have been shut down or temporarily stopped after being blamed for creating earth tremors.
More recently, a much anticipated showcase geothermal project in Lavey-les-Bains in western Switzerland was suspended for technical reasons.
Popular Stories
More
Culture
Documentary portrays Swiss teenagers forced to return to parents’ homeland
Switzerland condemned for deciding to deport gay Iranian
This content was published on
Switzerland violated the prohibition on inhuman treatment by considering that a gay Iranian could be returned to his country.
Gestational diabetes found to increase risk of adult-onset diabetes
This content was published on
A research team from the Lake Geneva region has identified persistent dysfunctions in glucose regulation in women with gestational diabetes. In the long term, this can increase the risk of adult-onset diabetes by up to ten times.
Swiss village must be evacuated by midday on Sunday
This content was published on
The village of Brienz-Brinzauls in eastern Switzerland, which is threatened by a rockfall, must be evacuated by 1pm on Sunday. All residents must leave the village.
This content was published on
A former judge of the Graubünden Administrative Court in eastern Switzerland has been found guilty of rape, sexual harassment and threatening a former trainee.
Costs and care time increase in Swiss retirement and nursing homes
This content was published on
In 2023 the costs of retirement and nursing homes increased by 5% compared to 2022 and those of assistance and care at home by 7%. Together, they amounted to CHF15 billion.
This content was published on
Almost half of the population in Switzerland shows clear to pronounced signs of smartphone addiction, according to a survey.
Swiss healthcare stakeholders want to save CHF300 million
This content was published on
The main players in the Swiss healthcare sector want to save around CHF300 million ($340 million) in healthcare costs a year from 2026.
If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.
Read more
More
Work begins on Swiss geothermal project after 20-year wait
This content was published on
Drilling has commenced at a Swiss geothermal project, designed to heat up to 3,000 homes, following a 20-year planning process.
This content was published on
Tests to determine the viability of geothermal energy projects in Switzerland have been hit by delays in getting the necessary planning permits.
You can find an overview of ongoing debates with our journalists here . Please join us!
If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.