Swiss perspectives in 10 languages

Holiday traffic jams build at Gotthard tunnel

traffic jam with cars and lorries
A controversial second tunnel will not be ready until at least 2030. Keystone

The start of the Easter holidays in many Swiss cantons has been causing long tailbacks at the Gotthard tunnel in central Switzerland, with waits of some two hours at the northern end. 

At the height of the congestion around midday, the traffic queue to enter the tunnel going south stretched for 14 kilometres, according to the Touring Club of SwitzerlandExternal link (TCS). This had eased to two kilometres by 6pm.  

For people travelling south, TCS recommended alternative routes, notably the Simplon tunnel. 

The traffic situation is also complicated by the fact that numerous high passes over the Alps remain closed because of wintry conditions.

The 17-kilometre Gotthard tunnel, which runs from Göschenen to Airolo under the famous Gotthard pass, is one of the main thoroughfares through central Switzerland, linking the German-speaking north with the Italian-speaking canton of Ticino in the south.

Opened in 1980, the road sees up to 17,000 vehicles pass through every day. A separate, 57-kilometre train line – unveiled in 2016 as the longest in the world – also cuts through the mountain. 

In February 2016, Swiss voters gave the go-ahead to build a second road tunnel, to allow for renovations of the existing infrastructure and ensure better connections between north and south. In so doing, they snubbed the concerns of opponents who see the second road tunnel as a threat to plans to cap transalpine road traffic and push heavy-weight trucks onto rail. 

The new tunnel, which is estimated to cost around CHF2.7 billion ($2.8 billion), will not open until 2030 at the earliest.

More

More

Major alpine road tunnel given green light

This content was published on Final results show a 57% majority of voters coming out in favour. A broad coalition of environmental groups and mainly leftwing parties challenged a decision by parliament last year for a second 17km tube through the Gotthard in the heart of Switzerland. Transport Minister Doris Leuthard said the broad support by voters from around the…

Read more: Major alpine road tunnel given green light


Popular Stories

Most Discussed

News

No Swiss bank in phase with environmental objectives

More

Swiss banks failing environment, says WWF

This content was published on None of the 15 major Swiss retail banks is meeting international climate and biodiversity targets, according to a ranking by WWF Switzerland.

Read more: Swiss banks failing environment, says WWF
UNRWA provides emergency assistance to just over one million Palestine refugees, or about 75 per cent of all Palestine refugees in Gaza, who lack the financial means to cover their basic food.

More

Lazzarini: no alternative to UNRWA in Gaza

This content was published on The only alternative to the UN Palestinian agency’s work in Gaza is to allow Israel to run services there, Philippe Lazzarini, UNRWA Commissioner-General, told reporters in Geneva on Monday.

Read more: Lazzarini: no alternative to UNRWA in Gaza

In compliance with the JTI standards

More: SWI swissinfo.ch certified by the Journalism Trust Initiative

You can find an overview of ongoing debates with our journalists here . Please join us!

If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.

SWI swissinfo.ch - a branch of Swiss Broadcasting Corporation SRG SSR

SWI swissinfo.ch - a branch of Swiss Broadcasting Corporation SRG SSR