Defective Gotthard road tunnel false ceiling removed
The defective false ceiling in the Gotthard road tunnel has been dismantled. The necessary work was completed on Tuesday morning, as the Federal Roads Office (FRO) announced.
According to a press release, the work is currently on track. The FRO continues to assess that the Gotthard road tunnel can be reopened to traffic this week.
Work is currently underway to secure the existing ceiling elements. Construction work will then begin to replace the defective false ceiling. A steel structure with the same cross-sectional area has been installed.
With this design, the functionality of the exhaust air duct can be guaranteed when the tunnel is put into operation. In the event of a fire, the smoke is extracted from the roadway via the exhaust air duct, writes the FRO.
The false ceiling suffered a technical defect over a length of 25 metres on Sunday afternoon.
This news story has been written and carefully fact-checked by an external editorial team. At SWI swissinfo.ch we select the most relevant news for an international audience and use automatic translation tools such as DeepL to translate it into English. Providing you with automatically translated news gives us the time to write more in-depth articles. You can find them here.
If you want to know more about how we work, have a look here, and if you have feedback on this news story please write to english@swissinfo.ch.
In compliance with the JTI standards
More: SWI swissinfo.ch certified by the Journalism Trust Initiative
You can find an overview of ongoing debates with our journalists here . Please join us!
If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.